Bigheart Creek

Owner: U.S. Corps of Engineers

System: Urethane Injection

Completed: July, 1987

Description:

Ground water was leaking through the expansion joints of this structure. CSC utilized urethane injection, at the expansion joints, to impede further ground water migration.