COT – Bridge Rail Repair

Owner: City of Tulsa
System: Concrete Replacement & Patching
Completed: 2005
Description:
A driver had crashed into the bridge railing and
destroyed some of the concrete columns and steel
railing. We patched concrete / formed & poured new
columns where needed. We outsourced the fabrication
of the steel railing and installed it in conjunction with our
new pours of the columns to match the existing look of
the bridge.