Exterior Slab Settlement

Owner: Tulsa International Airport

System: Pressure Grouting

Completed: 1988

Description:

The parking lot slab had begun to settle, in certain areas, due to soil erosion.  CSC drilled a series of 2” diameter holes and pumped a grout material under slab to fill void & lift the slab back to its original elevation.