HE – Bailey Turnpike

Owner: Oklahoma Turnpike Authority

System: Dry Shotcrete

Completed: 2013

Description:

The abutments on this bridge had begun to deteriorate. Corrosion had started within the reinforcing steel causing the concrete to spall. Spall locations were chipped, steel/substrate was cleaned & a prepackaged material was applied via a Shotcrete method.