Lake Hefner Boat Dock Repairs

Owner: City of Oklahoma City

System: Dry Shotcrete & Wear Coatings

Completed: 1997

Description:

The boat dock at Lake Hefner was in need of a much needed facelift.  Piers, beams & deck had severe deterioration along with excessive corrosion of the reinforcing steel.   Spalled concrete areas were prepped by mechanical means.  Steel was cleaned and in some places replaced.  Prepackaged concrete material was applied via a dry shotcrete process and said areas were finished to match existing contour lines.  Upon completion the piers, beams & deck received a protective coating.  We were recognized for awards on this project from 2 different organizations – The ICRI Award of Excellence and the AGC Merit Award in 1997.