Skiatook Lake Dam Stilling Basin Cover

Owner: US Army Corp. of Engineers

System: Wet Shotcrete

Completed: 2003

Description:

A basin cover was needed in the effort to keep debris from entering and clogging the basin.   We applied an estimated 200 CY of concrete, via wet shotcrete method, through 2 mats of reinforcing steel set 6” OC for a total thickness of 18” of cover.