918-663-1222

Spavinaw Dam

Dams

Owner: City of Tulsa
System: Wet Shotcrete
Completed: 2007

Concrete on the dam was spalling due to corrosion within the reinforcing steel. Spall locations were sawed, chipped, reinforcing steel cleaned, steel replaced, where needed, and repair areas were patched via a wet shotcrete method.