COT NWWTP Sludge Train Repairs

Water & Wastewater

Owner: City of Tulsa
System: Dry Shotcrete, Corrosion Resistant Reinforcement
Completed: 2014

Concrete within the sludge train was spalling due to corrosion within the reinforcing steel. Spalled locations were chipped, reinforcing steel cleaned/coated, steel replaced where needed and new prepackaged material was applied via a shotcrete method.