Warehouse Floor

Owner: Tulsa Based Manufacturing Plant

System: Pressure Grouting

Completed: 2002

Description:

This interior slab had begun to settle due to erosion of the sub grade and heavy loads being applied to the floor.  We drilled a series of 2” diameter holes and pumped a grout material, under the slab, to fill the void and lift the slab back to its original elevation.