Wood Structure Repairs

Owner:  Sand Springs Public Schools

System:  Epoxy Injection

Completed: 1998

Description:

The roof of this building had been overloaded with snow and led to stress in the wood supports.  We stabilized the beams and used epoxy pressure injection to fill cracks and re-establish a bond within the wood.