Woodward Park – Storm Sewer Tunnel Repairs

Owner: City of Tulsa

System: Urethane Injection

Completed: 1991

Description:

This storm sewer tunnel was experiencing ground water leaks.  We utilized high pressure urethane injection to impede the ground water leaks from entering the tunnel.